↑ Dan · Real Estate
📐 Definition & Done
🧭 Decision Points — calls needed to move this step forward
Tax protest: file online at erath-cad.com before May 15, 2026. Everything is ready — only Dan + Anne signatures remain.
06_tax_protest/PACKET/50-132-A_FILLED.pdf · 3 condition JPGs ready in PACKET/condition_photos_jpg/.No tradeoff — file now.
Decide by: May 15, 2026 (target May 8) · Unblocks: protest hearing, potential assessment reduction
Confirm axis weights for the scoring matrix (A-002 active): keep equal-weight v0.1, or calibrate Dan's actual priorities across 9 axes?
Recommended: Spend 10 minutes with RANKED_RECOMMENDATION.md to calibrate — the tie at the top is the biggest uncertainty right now.
Decide by: this week · Unblocks: clean primary exit decision
Primary exit path: S06 Sell As-Is (studs) vs. S12 Creative Alt Uses (RV pad + ag exemption stack)?
Recommended: S12 as the "while we're deciding" move — it doesn't foreclose S06 and generates income. Septic inspection is the gate before committing.
Decide by: after axis weights confirmed · Unblocks: next-deal capital timing
Septic inspection: commission now or wait until exit path is locked?
Recommended: Inspect before committing to S12. If S06 is the clear winner after weight calibration, skip the inspection.
Decide by: after primary exit decision · Unblocks: S12 RV pad setup, S02–S05 build scenarios
⚡ Next Moves — concrete actions, ordered
05_synthesis/RANKED_RECOMMENDATION.md — calibrate axis weights (A-002) or confirm equal-weight. Breaks the S06/S12 tie.
flowchart LR
A[File protest\nMay 15] --> B[Calibrate\naxis weights]
B --> C{S06 or S12?}
C -->|S06| D[List as-is\nCapital freed]
C -->|S12| E[Septic inspection\n+ ag exemption]
E --> F[RV pad income\nwhile deciding]
F --> G[Final exit\nor long hold]
📊 Status & Progress
12/12 oracles complete; synthesis + ranking done. Blocking: tax protest filing (May 15), axis weight calibration, primary exit choice.
🔗 Dependencies
📁 Assets